Slab, Pad, Footing, and Mix Reference Tools
A small set of concrete planning tools — volume in cubic yards and cubic meters, bag counts, cement quantity, and nominal mix charts — with the formulas and assumptions written on each page.
Reference tools
Use these pages to estimate rectangular concrete volume, bag counts, cement quantities for a nominal mix, and common mix ratios. Each calculator states the formula and the planning assumptions it uses. The homepage is a hub for those tools — it is not only a generic “concrete calculator” landing page.
How volume is calculated
For a rectangular slab, pad, or footing, volume is length × width × thickness (or depth). If thickness is entered in inches, convert it to feet first by dividing by 12, then divide cubic feet by 27 to obtain cubic yards. The same dimensions in meters multiply directly to cubic meters. A 5–10% waste allowance is a common planning addition, and ready-mix is often ordered in 0.25 cubic yard increments.
Example: a 10 ft × 10 ft slab, 4 inches thick, is 10 × 10 × (4 ÷ 12) = 33.33 cubic feet, or 1.235 cubic yards (0.944 m³). With a 10% waste allowance the planning volume is 1.358 cubic yards, which rounds up to 1.50 cubic yards in 0.25 yard increments.
Assumptions used on this site (typical planning figures; always confirm the product you buy): 1 cubic yard = 27 cubic feet. Thickness in inches is converted to feet (divide by 12) before multiplying. Typical premix bag yields: 80 lb ≈ 0.60 cu ft (~45 bags/yd³), 60 lb ≈ 0.45 cu ft (~60 bags/yd³), 40 lb ≈ 0.30 cu ft (~90 bags/yd³). A 5–10% waste allowance is common. Ready-mix is often ordered in 0.25 yard increments. Metric bag yields, when used: 25 kg ≈ 0.0125 m³ and 20 kg ≈ 0.010 m³, unless you enter the yield from the bag.
Disclaimer: These tools give planning estimates only. Bag yields vary by brand and mix, so check the coverage printed on the bag you buy. Ready-mix quantities, slump, reinforcement, and thickness for any structural, load-bearing, frost-protected, or code-regulated work must follow the project specification, the adopted local building code, and the judgment of a qualified professional. This site is not a structural design service and does not replace a licensed engineer or contractor.