Count Bags of Premixed Concrete

Convert a volume or a rectangle’s dimensions into a bag count using typical 40, 60, and 80 lb yields, or common 20 kg and 25 kg yields — and override those yields when the bag label differs.

Bag-count calculator

Enter either a known volume or the rectangle dimensions. If both are filled, the volume fields are used.

Option A — volume you already have

Option B — length × width × thickness

How the bag count is worked out

Premixed (“bagged”) concrete is sold by bag weight, but the useful figure is the yield — the volume of mixed concrete the bag is stated to produce. Typical planning yields used as defaults here are 0.60 cu ft for an 80 lb bag (~45 bags per cubic yard, because 27 ÷ 0.60 = 45), 0.45 cu ft for a 60 lb bag (~60 bags/yd³), and 0.30 cu ft for a 40 lb bag (~90 bags/yd³). For metric bags, the defaults are 0.0125 m³ for a 25 kg bag and 0.010 m³ for a 20 kg bag. These are widely used typical figures; brands differ, so prefer the yield printed on the bag or enter a custom yield.

The calculator divides the waste-adjusted volume by the yield and rounds up to a whole bag. A longer explanation, including a cubic-yard worked example, is on how many bags of concrete.

Assumptions used on this site (typical planning figures; always confirm the product you buy): 1 cubic yard = 27 cubic feet. Thickness in inches is converted to feet (divide by 12) before multiplying. Typical premix bag yields: 80 lb ≈ 0.60 cu ft (~45 bags/yd³), 60 lb ≈ 0.45 cu ft (~60 bags/yd³), 40 lb ≈ 0.30 cu ft (~90 bags/yd³). A 5–10% waste allowance is common. Ready-mix is often ordered in 0.25 yard increments. Metric bag yields, when used: 25 kg ≈ 0.0125 m³ and 20 kg ≈ 0.010 m³, unless you enter the yield from the bag.

Disclaimer: These tools give planning estimates only. Bag yields vary by brand and mix, so check the coverage printed on the bag you buy. Ready-mix quantities, slump, reinforcement, and thickness for any structural, load-bearing, frost-protected, or code-regulated work must follow the project specification, the adopted local building code, and the judgment of a qualified professional. This site is not a structural design service and does not replace a licensed engineer or contractor.