Count Bags of Premixed Concrete
Convert a volume or a rectangle’s dimensions into a bag count using typical 40, 60, and 80 lb yields, or common 20 kg and 25 kg yields — and override those yields when the bag label differs.
How the bag count is worked out
Premixed (“bagged”) concrete is sold by bag weight, but the useful figure is the yield — the volume of mixed concrete the bag is stated to produce. Typical planning yields used as defaults here are 0.60 cu ft for an 80 lb bag (~45 bags per cubic yard, because 27 ÷ 0.60 = 45), 0.45 cu ft for a 60 lb bag (~60 bags/yd³), and 0.30 cu ft for a 40 lb bag (~90 bags/yd³). For metric bags, the defaults are 0.0125 m³ for a 25 kg bag and 0.010 m³ for a 20 kg bag. These are widely used typical figures; brands differ, so prefer the yield printed on the bag or enter a custom yield.
The calculator divides the waste-adjusted volume by the yield and rounds up to a whole bag. A longer explanation, including a cubic-yard worked example, is on how many bags of concrete.
Assumptions used on this site (typical planning figures; always confirm the product you buy): 1 cubic yard = 27 cubic feet. Thickness in inches is converted to feet (divide by 12) before multiplying. Typical premix bag yields: 80 lb ≈ 0.60 cu ft (~45 bags/yd³), 60 lb ≈ 0.45 cu ft (~60 bags/yd³), 40 lb ≈ 0.30 cu ft (~90 bags/yd³). A 5–10% waste allowance is common. Ready-mix is often ordered in 0.25 yard increments. Metric bag yields, when used: 25 kg ≈ 0.0125 m³ and 20 kg ≈ 0.010 m³, unless you enter the yield from the bag.
Disclaimer: These tools give planning estimates only. Bag yields vary by brand and mix, so check the coverage printed on the bag you buy. Ready-mix quantities, slump, reinforcement, and thickness for any structural, load-bearing, frost-protected, or code-regulated work must follow the project specification, the adopted local building code, and the judgment of a qualified professional. This site is not a structural design service and does not replace a licensed engineer or contractor.