Estimate Concrete for a Pad
Work out the concrete volume for a shed, landing, or equipment pad from its rectangle dimensions. The result is a planning estimate, not a pad design.
Pads versus slabs
A pad is still a rectangular volume: length × width × thickness. This page is written for smaller pads — a shed floor, an outdoor equipment pad, a landing, or a similar isolated rectangle — but the arithmetic is the same as the slab calculator. Choose units that match how you measured the pad, including millimeters or meters.
Thickness is a design choice, not something this site can specify. In everyday residential work, 4 inches is a frequently used starting thickness for light, non-structural pads and walkways, but soil conditions, loads (for example a heavy generator or a vehicle), frost, and local code can require a different thickness, a compacted base, reinforcement, or a thicker edge. Treat any default in the form as an editable example, not a recommendation.
Assumptions used on this site (typical planning figures; always confirm the product you buy): 1 cubic yard = 27 cubic feet. Thickness in inches is converted to feet (divide by 12) before multiplying. Typical premix bag yields: 80 lb ≈ 0.60 cu ft (~45 bags/yd³), 60 lb ≈ 0.45 cu ft (~60 bags/yd³), 40 lb ≈ 0.30 cu ft (~90 bags/yd³). A 5–10% waste allowance is common. Ready-mix is often ordered in 0.25 yard increments. Metric bag yields, when used: 25 kg ≈ 0.0125 m³ and 20 kg ≈ 0.010 m³, unless you enter the yield from the bag.
Disclaimer: These tools give planning estimates only. Bag yields vary by brand and mix, so check the coverage printed on the bag you buy. Ready-mix quantities, slump, reinforcement, and thickness for any structural, load-bearing, frost-protected, or code-regulated work must follow the project specification, the adopted local building code, and the judgment of a qualified professional. This site is not a structural design service and does not replace a licensed engineer or contractor.